Fire Code and Plan Review

Anderson Valley Fire Department charges fees in accordance with the current AVCSD Fee Schedule (AVCSD Ordinance 2021-02) for reviewing and inspecting building and construction plans.  The California Office State Fire Marshal’s Office (OSFM) delegates this process to local fire districts under California Health and Safety Code 13145 . 

Plan Review process:

Step 1 - Provide construction plans to AVFD for CA state fire code compliance review and Development Fee review. Additional review will be required for any changes to the original plans. Plans can be submitted for review in person or online, here.

Step 2 - Fee payment for development fee and/or plan review, per fee schedule (below). You’ll receive an invoice to pay from. Payments can be made here.

Step 3 - AVFD provides a letter stating which fire code requirements must be met and stating that fees have been paid.

Step 4 - Schedule an appointment for a site visit for code compliance. Any necessary follow-up appointments will be subject to cost recovery fees.

Step 5 - Final letter of approval will be provided to the appplicant after successful site inspection.

 

Fee Schedule

Download PDF

The following services may be cost recovered at the rate of $65 per hour for office time and/or site visits to anyone receiving those services.  This rate may be billed for the actual time required (one-hour minimum, subsequent time rounded to the nearest half hour) to provide the required:  research, written report, and phone consultation.  Costs for site visits or inspection will include travel time plus mileage at the current IRS rate for all required or requested:


Section 4: COST RECOVERY OF SERVICES A fee in accordance with the following schedules shall be paid to the district at the time of application or upon the receipt of an invoice for services rendered.

A. The following services may be cost recovered at the rate of $65 per hour for office time and/or site visits to anyone receiving those services. This rate may be billed for the actual time required (one-hour minimum, subsequent time rounded to the nearest half hour) to provide the required: research, written report, and phone consultation. Costs for site visits or inspection will include travel time plus mileage at the current IRS rate for all required or requested:

Planning

Site Plan Review

  • Hourly Personnel cost according to Section 4A

Plan Review – Building Permit (Commercial/ Industrial/ Other)

  • Hourly Personnel cost according to Section 4A

Plan Review – Minor Subdivision (4 parcels or less)

  • Hourly Personnel cost according to Section 4A

Plan Review – Major Subdivision (more than 4 parcels)

  • Hourly Personnel cost according to Section 4AMin. 1 ½ Hr. plus $10 per lot

Fire Sprinklers

Automatic Fire Sprinkler System (fee includes water flow and supervision alarm test, hydro of underground and overhead pipe, and flush). Plan Review

  • Hourly Personnel cost according to Section 4A Min. 1 ½ Hr. plus $0.05 per sq. ft.

Sprinkler Underground Pipe Installation

  • $130

Existing Building – sprinkler alteration fee

  • Tenant improvement per space
    $65

  • Individual space > 3000 sq. ft.
    $65 plus $0.25 per head

Automatic fixed fire extinguishing systems (non-sprinkler or dry chemical), includes plan review and operational test

  • $130 each system

Fire alarm system – includes plan review and operational test

  • Hourly Personnel cost according to Section 4A $0.05 sq. ft. per area covered

All Construction

All construction and operational permits required under CFC 105. (Including but not limited to: Fire hydrants and valves, waste handling facilities, plant extraction systems, High piled storage, flammable and combustible storage, etc.)

  • Annual permit - $98 each

  • Hourly Personnel cost according to Section 4A Min. 1 ½ Hr. for plan checks and inspections

Additional Structures

Temporary Tent or Membrane Structure Permit

  • 400sq.ft. to 699 sq. ft.  $65

  • 700sq.ft. to 2499 sq. ft.  $98

  • 2500sq.ft. to 4999 sq. ft.  $163

  • More than 5000 sq. ft.  $228

Storage tank permits [removal, replacement, abandonment] fuel or oil, below or above ground

  • $65 each tank (includes inspection)

Additional Inspections

Follow up inspection or test; due to malfunction or noncompliance

  • Hourly Personnel cost according to Section 4A (including previous uncharged inspections)

Additional re-inspections

  • Hourly Personnel cost according to Section 4A

On-site inspection (less than 72-hour notice) existing buildings and tents

  • Hourly Personnel cost according to Section 4A (2-hour minimum)

On-site inspections (after hours, when available) existing buildings and tents

  • Hourly Personnel cost according to Section 4A at time and a half (2-hour minimum)


Hydrants

Hydrant flow testing (existing)

  • Hourly Personnel cost according to Section 4A

Hydrant flow calculation

  • Hourly Personnel cost according to Section 4A

Consultations & Variances

Project consultation fee

  • Hourly Personnel cost according to Section 4A (2-hour minimum). Half hour increments acceptable

Variance Application

  • $65 per submission

All required outside professional services

  • Actual cost plus 10% admin fee

Resources

 

Anderson Valley Community Services District

The mission of the Community Services District is to provide public services and programs, such as fire protection, airport access, street lighting, recreation and other community needs supported by the people of Anderson Valley.


Long Range Plan

2018 Revision, 5th edition – To be used as a benchmark to measure progress over the years. Review of Department revenues, expenses and reserves. Fire Prevention activities will be reviewed and recommendations for improvement will be made. The current status of apparatus, facilities, equipment and personnel will be detailed along with recommendations for changes and improvements in these areas to better serve the people of Anderson Valley.